大型近接暗挖换乘地铁车站施工关键技术 被引量:3

The Key Construction Technic for Large-scale Underground-excavated Metro Station
下载PDF
导出
摘要 论述大型近接暗挖换乘地铁车站施工过程中超大跨隧道、近接交叉重叠隧道、狭小场地小竖井转大断面施工技术,说明其施工流程及关键技术,为了保证繁华城区大型近接暗挖换乘地铁车站工程安全顺利的完成,需要确定各个部位的施工顺序,本文结合广州地铁区庄的实施情况,对施工技术的可靠性、安全性、质量及施工效率等进行研究,通过数值模拟计算和现场量测数据,确定了最优支护结构形式及合理的开挖支护施工方案,为今后类似工程拓宽思路并提供可资借鉴的实例。 In the paper, it introduces that the key construction technic and flow of large span tunnel, crossing and overlapping tunnel, shaft-well in narrow space for large-scale underground-excavated metro station. In order to complete the large-scale underground-excavated metro station in the downtown, construction flow should be determined and the reliability, safety, and quality of the construction should be studied. Through numerical simulation and measuring in site, the best scheme for excavation and support is determined. It is helpful to similar project in the future.
作者 苏建丰 杜普
出处 《广州建筑》 2012年第5期14-19,共6页 GUANGZHOU ARCHITECTURE
关键词 大跨隧道 轴向拉压稳定杆 立体交叉隧道 狭小场地 梁柱支承体系 转换 large span tunnel axial stabilizer rod stereo crossing tunnel narrow space beam and columnsupported system transfe
  • 相关文献

参考文献4

二级参考文献11

共引文献187

同被引文献19

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部