摘要
唐河水电站的坝型是混凝土面板堆石坝,坝高26.9 m,坝顶长度280.5 m。文中叙述了坝基处理、坝体碾压试验及筑坝的方法。
The dam type of Tanghe Hydroelectric Station is rock-fill dam with concrete face slab. Its dam height is 26.9m, and its length of dam top is 280.5m. In this paper, the treating dam foundation , the rolling test of dam body and the method of constructing dam are introduced.
出处
《山西水利科技》
2012年第4期55-56,共2页
Shanxi Hydrotechnics
关键词
混凝土面板堆石坝
基础处理
碾压试验
坝体填筑
rock-fill dam with concrete face slab
foundation treatment
rolling test
constructing dam