期刊文献+

污水处理场设计规模的探讨 被引量:1

DISCUSSION ON DESIGN CAPACITY OF WASTEWATER TREATMENT PLANT
下载PDF
导出
摘要 调研发现,国内大多数石油化工企业配套污水处理场的实际处理水量和污染物浓度远小于设计值,存在着设备闲置率较高、污水处理单耗偏高、新技术的性价比较差以及生化处理系统长期处于低负荷下运行造成抗冲击能力较差等问题;从生产运行和设计两方面分析了造成污水处理场设计规模偏大、运行负荷不足的原因;提出了解决这些问题的建议。 Investigation results show that the actual wastewater treatment quantity and pollutant concentrations of most wastewater treatment plants in refinery or ethylene supporting units in China are much less than design values,which leads to problems such as high proportion of equipment idling,high unit consumption of wastewater treatment,low C/P ratio for advanced technology applied,and poor impact load resistance of biological treatment system due to long period of running under low load.After analyzing the reasons for the difference between actual operation and design,this article proposes some recommendations for the design of wastewater treatment plant including the calculation of suitable capacity,the selection of appropriate reserved pattern and the adoption of energy saving measures.
作者 何小娟
出处 《石油化工设计》 CAS 2012年第4期4-6,5,共3页 Petrochemical Design
关键词 污水处理场 设计规模 实际处理量 实际负荷 Wastewater treatment plant Design capacity Actual treatment quantity Actual load
  • 相关文献

参考文献1

  • 1GB50747-2012石油化工污水处理设计规范[S].北京:中国计划出版社,2012.

共引文献1

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部