某600MW机组再热蒸汽冷段管道倾斜变形原因分析与处理 被引量:1

Reason Analysis and Processing of Inclination Deformation in Reheat Steam Cold Pipeline of 600 MW Unit
下载PDF
导出
摘要 针对某电厂600MW机组试运期间发现的再热蒸汽冷段管道倾斜变形问题,通过管道热膨胀及支吊架状态的现场检查、管系静力计算分析,找出了管道倾斜变形的原因,提出了有效的处理措施。管道的倾斜变形主要是因为再热器入口集箱前冷段管道向下的热位移受阻造成,而支吊架设计不合理、载荷偏大是管道向下的热位移受阻的主要原因。 The inclination deformation problems in reheat steam cold pipeline of 600 MW unit was described. Through spot inspection of pipe thermal expansion, supports and hangers status, pipe system static calculation, the reason has been identified and effective measures has been put forward. The deformation of the pipline is formed by thermal displacement hindered of the cold pipeline before the reheater inlet header. The hanger unreasonable design and the larger load were the main reasons of thermal displacement hindered of the pipeline.
出处 《理化检验(物理分册)》 CAS 2012年第11期749-752,共4页 Physical Testing and Chemical Analysis(Part A:Physical Testing)
关键词 再热蒸汽冷段管道 倾斜变形 热膨胀 设计问题 cold reheat steam pipeline inclination deformation thermal expansions design problem
  • 相关文献

参考文献3

  • 1DL/T5054-1996.火力发电厂汽水管道设计技术规定[S].[S].,..
  • 2DL/T616-2006,火力发电厂汽水管道与支吊架维修调整导则[S].
  • 3安付立,王军民,秦光伟,等.四川泸州川南发电有限责任公司1,2号机组再热蒸汽冷段管道热膨胀异常原因分析与处理[R].西安:西安热工研究院有限公司,2008.

共引文献76

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部