期刊文献+

玉溪煤矿副斜井基岩段大断面快速掘进技术 被引量:2

Rapid Excavation Technology with Large Section in Auxiliary Inclined Shaft in Bedrock Section of Yuxi Coal Mine
下载PDF
导出
摘要 为了提高大断面斜井井筒在基岩段的掘进速度,对玉溪煤矿副斜井井筒施工工艺进行了分析,选用弱震、弱冲光面爆破等先进的施工技术,优化设置辅助系统,充分利用掘支平行作业,减少了辅助及循环时间,为矿井投产奠定了基础。 To improve driving speed in bedrock section of inclined shaft with large section, the construction technics of auxiliary inclined shaft in Yuxi Coal Mine was analysed. Weak-vibration blasting,weak-impact smooth blasting were chosen in coal mine, the auxiliary sys- tem was also optimized,drivage and supporting process were operated parallelly as much as possible. The application of rapid excavation technology has shorten the time for auxiliary work and process cycle,and laid a solid foundation for the production of the coal mine.
作者 马璐
出处 《中州煤炭》 2012年第11期60-61,共2页 Zhongzhou Coal
关键词 快速掘进 施工质量 组织管理 rapid excavation construction quality organization and management
  • 相关文献

参考文献3

二级参考文献12

共引文献48

同被引文献8

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部