期刊文献+

世行贷款项目FIDIC合同条件下如何做好工程师的工作

How to Do the Engineering's Work Well Under the Condition of FIDIC Contract
下载PDF
导出
摘要 引黄工程国际Ⅰ、Ⅱ、Ⅲ标采用世行贷款 ,按照世行要求合同文本采用FIDIC条款。文中就如何在FIDIC合同条件下做好工程师工作进行了论述。 In this paper,the following viewpoint on project construction is given.Under the condition of the FIDIC contract,in order to make the project construction well,firstly,the project should have a good design and a rational time limit determined according to natural law and scientific law,then the strong and qualified contractor should be selected.Based upon them,the employer should determine the engineer by the way of bidding or direct assignment,then the engineer should be fully authorized to realize the connection of his duty and right.Finally,the engineer should grasp the three key links,namely,progress control,investment control and quality control to do his own job well.Some problems on progress control,investment control and quality control such as judgement of responsibility of term delay,quality control on design and material,on situ supervising,changing of quantity,unit price,size and content of the project and claim are also discussed.
作者 张俊杰
出处 《山西水利科技》 2000年第2期45-47,共3页 Shanxi Hydrotechnics
关键词 FIDIC合同条件 工程师 质量控制 进度控制 Progress Control Investment Control Quality Control Engineer FIDIC Contract
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部