摘要
苏州圆融星座工程体量大,结构复杂,但施工场地局促,施工平面布置及垂直运输协调管理困难。在深基坑工程阶段,通过合理地进行施工平面布置转换,解决了场地紧张的问题。
Suzhou Harmony Star Project has big volume and complex structure, but the construction site is limited, arrangement of construction plane and vertical transportation management are difficult. During construction of deep foundation pit, the limited construction site is successfully solved through reasonable construction plane conversion.
出处
《建筑技术》
2012年第12期1094-1097,共4页
Architecture Technology
关键词
深基坑工程
施工平面布置
施工管理
deep foundation pit engineering
construction plane layout
construction management