针对基坑降水在 5~ 6m时 ,一级轻型井点实际效果不太理想的情况 ,设计采用一级轻型井点配合局部深井降水 ,通过在实际工程中的应用取得了较好的降水效果 .在施工中采取回灌井点等技术措施 。
When the first-degree light well point has no good practical results in view of the base pit precipitation at five to six meters,the first-degree light well point coordinated with the partial deep well precipitation which has been designed and applied to the practical projects has achieved better precipitation results.By taking technical measures like return irrigation well point under construction,it can also effectivelly control the negative influence on the surroundings from precipitation.
出处
《华北水利水电学院学报》
2000年第2期21-23,共3页
North China Institute of Water Conservancy and Hydroelectric Power
关键词
深基坑
降水
轻型井点
深井法
高层建筑
deep base pit precipitation
light well point
deep well method