脱硫系统取消旁路烟道后的问题及应对措施 被引量:8

Problems of Bypass Flue Removed Desulphurization System and the Countermeasures
下载PDF
导出
摘要 分析了火力发电机组取消旁路烟道的技术可行性和安全性,讨论了旁路烟道取消后给机组及脱硫系统带来的一系列技术问题,结合现有无旁路脱硫系统的运行实践,对取消旁路后出现的问题,从设备改造、运行调整等方面提出了应对措施。 The paper analyzes technical feasibility and safety of removing bypass flue from thermal generator sets and it discusses technical problems brought to units and desulphurization system due to the removal of bypass flue. In combination with practical operation of current non-bypass desulphurization system, the paper proposes countermeasure against problems due to removal of bypass in terms of equipment transformation, operation adjustment and so forth.
出处 《浙江电力》 2012年第11期69-72,共4页 Zhejiang Electric Power
关键词 发电厂 脱硫 烟道旁路 取消 power plant desulphurization bypass flue removal
  • 相关文献

参考文献6

二级参考文献27

  • 1蔡明坤.FGD系统用GGH设备设计[J].锅炉技术,2004,35(5):1-4. 被引量:13
  • 2赵生光.火电厂湿法烟气脱硫取消旁路烟道可行性分析与探讨[J].中国电力,2007,40(6):81-85. 被引量:28
  • 3胡志光.电除尘器运行及维修[M].北京:中国电力出版社,2003.
  • 4曾庭华 杨华 王斌.湿法烟气脱硫系统的安全性及优化[M].北京:中国电力出版社,2003..
  • 5杨飚.二氧化硫减排技术与烟气脱硫工程[M].北京:冶金工业出版社,2004.1 -11.
  • 6电力规划设计总院.火力发电厂湿法烟气脱硫取消旁路烟道可行性专题研究报告[R].2007.
  • 7蒋丛近.三河发电厂取消烟气旁路对脱硫系统装置设计和设备运行影响的研究[R].国华荏原环境工程有限责任公司,2007.
  • 8DL/T5196—2004火力发电厂烟气脱硫设计技术规程[S].北京:中国电力出版社,2005.
  • 9电力可靠性管理中心.全国发电机组手册(2006年版)[S].北京:中国电力出版社,2006.
  • 10杨佳珊,黄涛.火电厂废水处理后回用于烟气脱硫系统的可行性[J].东北电力技术,2007,28(11):35-37. 被引量:13

共引文献56

同被引文献45

引证文献8

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部