摘要 本期刊登全文的第三部分 (下 )主要介绍我国大型地下洞室布置以及新奥法、先固后挖法在我国大型地下洞室施工中的运用 ,特别介绍了小浪底水利枢纽工程洞室群间距新的突破以及大吨位岩壁梁在诸多地下厂房中的运用。还介绍了我国台湾日月潭抽水蓄能电站先固后挖法施工的成功经验。 This is the third part of the paper,highlighting the layout of large caverns and application of NATM,preconsolidation and postexcavation method in construction of large caverns in China.Particularly the new breakthrough in design of interval between caverns for the Xiaolangdi water control project and application of large tonage rockwall beam in underground powerhouses are described.Finally the successful expenences in construction of the Mingtan pump storage power station by the method of preconsolidation and postexcavation.
作者 张有天
出处 《西北水电》 2000年第2期13-20,共8页 Northwest Hydropower
关键词 洞室群 岩壁梁 先固后挖法 地下洞室 施工 caverns,rockwall beam,preconsolidation and post excavation method,pump storage power station
  • 相关文献

参考文献20

二级参考文献7

  • 1董兴林,高季章,鲁慎吾,钟永江.导流洞改为旋涡式竖井溢洪道综合研究[J].水力发电,1995,22(3):32-37. 被引量:33
  • 2高建生,水利学报,1989年,10期
  • 3徐福生,水利学报,1988年,11期
  • 4才君眉,水利学报,1987年,4期
  • 5华绍曾,实用流体阻力手册,1985年
  • 6团体著者,水力计算手册,1980年
  • 7张有天,张武功,王镭.再论隧洞水荷载的静力计算[J]水利学报,1985(03).

共引文献142

同被引文献37

引证文献3

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部