为把小浪底水利枢纽建成一流工程而努力奋斗

Striving to construct the Xiaolangdi Multipurpose Project to be a first class project
下载PDF
导出
摘要 小浪底水利枢纽是治理开发黄河的关键性控制工程 ,已于 1997年 10月截流 ,2 0 0 0年 1月 9日首台机组并网发电 ,工程建设管理按照国际招标工程的管理模式进行。几年来 ,通过业主、监理、设计、承包商四方共同努力 ,为中国的国际工程建设管理积累了很多好的经验 ,为国内其他工程的建设提供了宝贵的借鉴。 The Xiaolangdi Multipurpose Project is key to the harnessing and development of the Yellow River The river closure for the Project was completed in October 1997 and the first generating unit was put into operation and connected with the power grid on January 9, 2000 The construction and management of the Project were carried out in accordance with the management modes of international bidding project For several years, with the concerted efforts of the Owner, Supervisor, Designer and Contractor, a lot of good experience have been gained for the international project construction and management in China, which also could be used in the construction of other projects at home for reference
作者 张基尧
机构地区 水利部
出处 《水力发电》 北大核心 2000年第8期4-8,共5页 Water Power
关键词 国际工程 建设管理 经验总结 小浪底水利枢纽 international project, construction and management, experience summary, Xiaolangdi Multipurpose Project

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部