期刊文献+

水工枢纽泄洪及电站负荷调节对垂直升船机运行的影响 被引量:3

Effects of flood discharge and regulation of power load on operation of vertical ship lift in hydropower station
下载PDF
导出
摘要 本文介绍了水口电站因泄洪与电站负荷调节引起的坝下往复波流对垂直升船机运行影响的水力学试验成果 .在试验研究的基础上提出以下成果 :承船厢与航道中影响波高值的因素 ;从电站调峰到承船厢内出现允许波幅所需时间T1 及到达稳定水位所需时间T2 ;承船厢、航道中可能出现的最大、最小水深 ;承船厢中最大、最小水重与超载情况 ;瞬时水面线、最大水面坡度和流速 . The effects of unsteady flow downstream the hydropower station dut to flood discharge and load regulation on the operation of ship lift are studied in a hydraulic model test. The factors affecting the wave heights in ship compartment and navigation channel, the time period from peak power regulation to the arise of maximum wave height and the duration for water surface reaching a steady level are investigated. Furthermore, the probable maximum and minimum water depths in ship compartment and in navigation channel, the maximum and minimum water weight in compartment as well as the maximum water surface slope and velocity are studied.
作者 谢佩珍
出处 《水利学报》 EI CSCD 北大核心 2000年第7期77-85,共9页 Journal of Hydraulic Engineering
关键词 垂直升船机 电站负荷调节 承船厢 泄洪 vertical ship lift power load regulation ship compartment flood discharge wave height wave amplitude
  • 相关文献

参考文献1

同被引文献16

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部