3David Ardit, Thanat Pattanakitchamroon:Analysis Methods in Time-Based Claims,J. Constr. Engrg. and Mgmt, 2008,134.
4J. K. Yates, M.ASCE, Alan Epstein, M.ASCE :Avoiding and Minimizing Construction Delay Claim Disputes in Relational Contracting,Journal of Professional Issues in Engineering Education and Practice, 2006.
5成虎.建筑工程合同管理与索赔[M].南京:东南大学出版社,2003.
6Garza M J esus , Prateapusanond Apirath , AmbaniNi- khil. Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract [ J]. Journal of Const ruction Engineering and Management , 2007,133( 11 ) :836-845.