期刊文献+

基于Pareto最优的多目标集成协作计划与调度 被引量:1

Multi-objective integrated manufacturing collaborative planning and scheduling based on Pareto Optimal
下载PDF
导出
摘要 针对现有制造系统中协作计划、生产计划和调度方案不能同步制定的问题,考虑在供应链环境下有协作的计划与调度,构建了一种多目标集成协作计划与调度优化模型。提出一种基于Pareto最优的多目标优化算法,设计了包含协作染色体的基于作业的集成编码方案,通过惩罚操作实现协作计划与生产计划的同步协调。考虑供应链协调中常见的完工时间、总成本、总拖期时间、平均流经时间四个性能指标对模型进行整体优化。通过仿真实验验证了模型及其算法的有效性。 Aiming at the unsynchronized making of collaborative plan, production plan and scheduling solutions in ex- isting manufacturing systems, a model of multi-objective integrated collaborative plan and scheduling was construc- ted by considering the scheduling with collaborative plan under the circumstance of supply chain. A multi-objective optimization algorithm based on Pareto Optimal was proposed, and the task-based integrated coding scheme which included collaborative chromosome was designed. Through penalty operations, the simultaneous coordinating of col- laborative plan and manufacturing plan was achieved. Four common performance indexes such as completion time, total cost, total delay time and average flow time in supply chain coordination were considered to optimize the mod- el. The effectiveness of proposed model and algorithm was proved by simulation experiment.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2012年第11期2419-2426,共8页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(61170201)~~
关键词 多目标优化 集成模型 调度 协作计划 multi-objective optimization integrated models scheduling collaborative planning
  • 相关文献

参考文献21

  • 1USHER M, FERNANDES K. Dynamic process planning-th static phase[J]. Journal of Materials Processing Technology,1996,61(5):3-8.
  • 2KUMAR M, RAJOTIA S. Integration of scheduling with computer aided process planning[J]. Journal of Materials Pro- cessing Technology, 2003,138(1/2/3) : 297-300.
  • 3CHRYSSOLOURIS G, CHAN S, COBB W. Decision making on the factory floor: an integrated approach to process planning and scheduling[J]. Robotics and Computer-Integrated Manu- facturing, 1984,1(3/4) :9-315.
  • 4CHRYSSOLOURIS G, CHAN S. An integrated approach to process planning and scheduling[J]. Annals of the CIRP, 1985, 34(1) :7-413.
  • 5BECKENDORFF U, KREUTZFELDT J, ULLMANN W. Reactive workshop scheduling based on alternative routings [C]//Proceedings of a Conference on Factory Automation and Information Management. Boca Roton, Fla. , USA: CRC Press, 1991 : 75-85.
  • 6LI X Y, SHAO X Y, GAOL. Optimization of flexible process planning by genetic programming[J]. International Journal of Advanced Manufacturing Technology, 2008,38 (1) : 43-53.
  • 7FATTACHI P, MEHRABAD M S, JOLAI F. Mathematical modeling and heuristic approaches to flexible job shop schedu- ling problems[J]. Journal of Intelligent Manufacturing, 2007, 18(3) :31-42.
  • 8MOON C, LEE Y H, JEONG C S, et al. Integrated process planning and scheduling in a supply chain[J]. Computers and Industrial Engineering, 2008,54 ( 10 ) : 48-61.
  • 9SHAO Xinyu, LI Xinyu, GAO Liang, et al. Integration of process planning and scheduling-a modified genetic algo- rithm-based approach[J]. Computers & Operation Research, 2009,36(6) : 2082-2096.
  • 10ZHANG W J, XIE S Q. Agent technology for collaborative process planning: a review[J]. International Journal of Ad- vanced Manufacturing Technology, 2007,32(3): 15-25.

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部