摘要
分析了高压水破坏煤岩机理,介绍了高压水射流割缝设备系统结构,该技术在首山一矿进行了应用,实现了石门安全高效揭煤,揭煤周期缩短了35.9%。
The mechanism of coal rock broken by high-pressure water was analyzed, and the system architecture of high-pressure water jet slotting equipment was introduced. The application to Shoushan No. 1 mine showed that this technique achieved the safe rock cross-out coal uncove- ring in high efficiency, and the period of coal uncovering was shortened by 35.9 %.
出处
《中国煤炭》
北大核心
2012年第11期90-93,共4页
China Coal
关键词
水射流
卸压
石门揭煤
water jet, pressure release, rock cross-out coal uncovering