提出采用设定地震方法对三峡库区地震进行了危险性评估,其条件为水库诱发地震与构造地震同时存在。研究结果表明:设定地震类型对于滑坡安全系数各类特征值影响明显,设定地震位置对于黄土坡滑坡稳定性具有重要影响。
A scenario earthquake method is proposed in order to evaluate the seismic risk in the region of the Three Gorges project under the condition that reservoir induced earthquake and tectonic earthquake exist simultane- ously. The results show that the scenario earthquake type affects all kinds of eigenvalue of the safety factor of land- slide obviously and scenario earthquake location affects the stability evaluation.
出处
《大地测量与地球动力学》
CSCD
北大核心
2012年第6期65-70,共6页
Journal of Geodesy and Geodynamics
基金
国家自然科学基金重点项目(40730317)
中国长江三峡工程开发总公司项目(SXSN/2377)
关键词
设定地震
水库地震
安全系数
黄土坡滑坡
三峡库区
scenario earthquake
reservoir earthquake
factor of safety
Huangtupo landslide
Three Gorges reservoir area