大型水电站隧洞开挖施工的三维数值模拟研究 被引量:3

3-D numerical simulation study on tunneling for large-scale hydropower station
下载PDF
导出
摘要 随着我国水电站装机巨型化,隧洞大型化的发展,特大断面隧洞的出现使其施工面临严峻的考验。隧洞作为水电站的关键设施,对其施工导流、泄洪起着尤为重要的作用。利用ANSYS对大型隧洞开挖进行数值模拟,以了解大型隧洞的位移场分布,选择合适的开挖方案。对保障施工安全、加快施工进度均具有十分重要的意义。 Following the development of hydropower station with giant hydro-generator unit and large-sized tunnel in China, the occurrence of tunnel with super large-sized cross-section makes its construction facing with an austere challenge. As one of the key facilities of a hydropower station, tunnel places an important role in the construction diversion and flood discharge of it. An ANSYS based numerical simulation is made on the excavation of large-sized tunnel herein, so as to make sure of the distribution of the displacement field of a large-sized tunnel and select a relevant appropriate excavation scheme. This has a very important significance for ensuring construction safety and speeding up construction progress.
出处 《水利水电技术》 CSCD 北大核心 2012年第11期37-40,共4页 Water Resources and Hydropower Engineering
关键词 大型水电站 隧洞 数值模拟 开挖方法 large-scale hydropower station tunnel numerical simulation excavation method
  • 相关文献

参考文献3

二级参考文献8

共引文献2

同被引文献13

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部