摘要
输变电工程在电网建设中起着弥足举重的作用,关于其项目后评价的工作好坏与否,直接关系到项目的成功与后续使用情况。文章从输变电工程项目出发,提出了其相关指标体系的建立与评价方法,为现有输变电工程项目的后评价提供了理论依据。
Power transmission project plays important role in the construction of power grids. Its project evaluation good or bad is directly related to the success of the project and the subsequent use. From the power transmission project, the paper was put forward construction and evaluation methods of related index system, which provided theory basis for post project evaluation of power transmission project.
出处
《科技创新与生产力》
2012年第11期56-58,共3页
Sci-tech Innovation and Productivity
关键词
输变电工程
项目后评价
指标体系
层次分析法
power transmission project
post project evaluation
index system
analytic hierarchy process