摘要
海上油田开发初期钻井方式、中后期修井和钻调整井方式直接影响海上平台的数量和形式,同时开发后期调整井作业又制约着前期总体开发方案机具选择。以渤海A油田开发实例,计算分析了油田开发后期钻调整井的时间和工作量对前期研究时钻修井机具选择的影响。研究结果表明,后期调整井作业影响油田新建时钻修井机具的选择,该认识可为海上油田开发初期钻修井机具选择提供参考。
Initial drilling, middle-later workover and adjustment well drilling methods directly affect the number and general layout of offshore oilfield devel opment platform, meanwhile the later adjustment restricts previous rig selection in overall development plan. Taking the development of Bohai A oilfield as example, we calculated and analyzed the influence of later adjustment well drilling time and workload on the selection of drilling and workover rig in the early study. The results show that later adjustment affects the initial selection of drilling and workover rig in early oilfield development, which could provide ref- erence to initial selection of drilling and workover rig for offshore oilfield development.
出处
《中国海上油气》
CAS
北大核心
2012年第6期51-53,共3页
China Offshore Oil and Gas
基金
中国海洋石油总公司青年科技与管理创新研究课题"海洋石油钻完井方式优选及投资估算一体化软件的开发及应用(编号:JZTW2011KJ05)"部分研究成果
关键词
海上油田
开发后期调整
初期钻修井机具选择
影响分析
offshore oilfield
later adjustment ofoilfield development
initial selection of drillingand workover rig
influence analysis