期刊文献+

混凝土浇筑期高大模板支撑体系的受力性能研究 被引量:14

RESEARCH ON PERFORMANCE OF HIGH FORMWORK SUPPORT SYSTEM DURING CONCRETE PLACEMENT
原文传递
导出
摘要 为了掌握混凝土浇筑期高大模板支撑体系的受力性能,实地搭建8m高扣件式模板支架进行试验。通过吊装钢渣加载的方式模拟混凝土浇筑过程,测试模板下立杆轴力变化进行,给出了荷载施加顺序和支架受力的关系;提出了有限元建模方法对浇筑期支撑体系的工作状态进行模拟,通过对比发现本文提出的方法可以较为有效地计算立杆受力;将试验结果与现行规范计算结果进行对比,发现了现行规范存在的不足。 In order to grasp the performance of a high formwork support system during concrete placement, an eight-meter-high formwork support system with couples is erected and the test is finished in a construction field. The process of pouring concrete is simulated by putting steel slags. During the period of loading, the axial strains of supporters are measured and the relationship between the loading order and the forces acting at the top of falsework is given. A method of simulating the working state of a formwork support system by finite element analysis (FEA) is proposed. The comparison between calculating results and test results shows that the axial forces of supporters can be obtained effectively by FEA according to the method. The results according to the code are also compared with the test results and some shortcomings in the code are found.
出处 《工程力学》 EI CSCD 北大核心 2012年第A02期164-169,共6页 Engineering Mechanics
基金 国家自然科学基金项目(51078018)
关键词 高大模板支架 混凝土浇筑期 施工荷载 试验测试 有限元计算 high falsework period of concrete placement construction load test finite element analysis
  • 相关文献

参考文献11

二级参考文献25

共引文献133

同被引文献82

引证文献14

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部