摘要 考虑JIT环境下基于Supply-hub的供货模式,建立了制造商、Supply-hub和供应商的平均成本函数,提出了供应链分散决策和集中决策情形下的制造商和供应商的生产与订货批量模型。结果表明,制造商的生产批量在供应链分散决策时变化无规律,而在供应链集中决策时随着供应商与Supply-hub之间距离的增加而增加;相比分散决策,供应链集中决策时制造商的成本增加而供应商的成本减少,而整个供应链的总成本减少,供应商可以通过转移支付让制造商和供应商均受益,从而实现整个供应链的帕累托优化,随着供应商与Supply-hub之间的距离增加,协调能够让供应链得到更多的收益。 Considering the supply pattern based on supply-hub under the Just-in-Time environment, the cost functions of manufacturer, supply-hub and supplier are established. Two supply chain lot size models for product manufacturing and material ordering are proposed under different decision modes: one is proposed under decentralized model based on Stackelberg model, the other is proposed under centralized model of the integrated supply chain. The results show that the manufacturer's production lot size changes disorderly under decentralized model, but it increases along with the increase of the distance between supplier and supply-hub under centralized model. Compared to decentralized model, the total cost of manufacturer increases but the total cost of both suppher and the whole supply chain decreases under centralized model. Through appropriately reducing material transfer price, the whole supply chain may achieve Pareto optimization since the manufacturer and supplier can obtain a win-win solution, and the farther distance between supplier and supply-hub, the more benefit the whole supply chain can get by coordination.
作者 桂华明
机构地区 湖北大学商学院
出处 《管理评论》 CSSCI 北大核心 2012年第11期60-69,共10页 Management Review
基金 国家自然科学基金项目(71071050)
关键词 供应链 集配中心 联合生产与订货 批量模型 supply chain, supply-hub, integrated production-ordering systems, lot size models
  • 相关文献

参考文献16

  • 1Zuckerman A. Compaq Switches to Pre-Position Inventory Model[R]. World Trade, April, 2000:72-74.
  • 2Cheong M. L. F., Bhatnagar R., Graves S. C. Logistics Network Design with Supplier Consolidation Hubs and Multiple Shipment Options[J]. Journal of Industrial and Management Optimization-AIMS, 2007,3(1):51-69.
  • 3Shah J., Goh M. Setting Operating Policies for Supply Hubs[J]. International Journal of Production Economics, 2006,100(2):239-252.
  • 4马士华,龚凤美,刘风华.基于集配中心的生产和配送协同决策研究[J].计算机集成制造系统,2008,14(12):2421-2430. 被引量:29
  • 5黎继子,马士华,郭培林,刘春玲.基于BOM-Supply Hub的供应链设计模型[J].计算机集成制造系统,2009,15(7):1299-1306. 被引量:14
  • 6桂华明,马士华.Supply-hub环境下的多源供货模式与协同批量决策研究[J].中国管理科学,2010,18(1):78-82. 被引量:12
  • 7Jamal A. M. M., Sarker B. R. An Optimal Batch Size for a Production System Operating under a Just-in-Time Delivery System[J]. International Journal of Production Economic, 1993,32(2):255-260.
  • 8Sarker B. R., Parija G. R. Optimal Batch Size and Raw Material Ordering Policy for a Production System with a Fixed-Interval, Lumpy Demand Delivery System[J]. European Journal of Operational Research, 1996,89(3):593-608.
  • 9Parija G. R., Sarker B. R. Operations Planning in a Supply Chain System with Fixed-Interval: Deliveries of Finished Goods Multiple Customers[J]. lie Transactions, 1999,31(11):1075-1082.
  • 10Lee W. A Joint Economic Lot Size Model for Raw Material Ordering, Manufacturing Set Up, and Finished Good Delivering[J]. Omega, 2005,33(2):163-174.

二级参考文献39

  • 1BARNES E, DAI J, DENG Shijie, et al. On the strategy of supply hubs for cost reduction and responsiveness[R]. Singapore: National University of Singapore, 2000.
  • 2HAHM J, YANO C A. The economic lot and delivery scheduling problem:the single item case[J]. International Journal of Production Economics, 1992,28 ( 2 ) : 235-252.
  • 3HAHM J, YANO C A. Economic lot and delivery scheduling problem:the common cycle case[J].IIE Transactions, 1995, 27(2):113- 125.
  • 4HAHMJ, YANO CA. Economic lot and delivery scheduling problem:the nested schedule case[J]. IIE Transactions, 1995, 27(2):126 -139.
  • 5KHOUJA M. The economic lot and delivery scheduling proh lem:common cycle, rework, and variable production rate[J].IIE Transactions, 2000,32(8) :715- 725.
  • 6CLAUSEN J, JU S. A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case[J]. European Journal of Operational Research, 2006,175 (2) ,1141-1150.
  • 7VERGARA F E, KHOUJA M, MICHALEWICZ Z. An evolutionary algorithm for optimizing material flow in supply chains[J]. Computers Industrial Engineering, 2002,43(3):407-421.
  • 8KHOUJA M. Synchronization in supply chains:implications for design and management[J]. Journal of the Operational Research Society, 2003,54(9) :984-994.
  • 9PUNDOOR G. Integrated production distribution scheduling in supply chains[D]. College Park, Md. , USA: University of Maryland, 2005.
  • 10VONDERRMBSE M A, UPPAL M. HUANG SH, et al. Designing supply chains: towards theory development[J].Inter national Journal of Production Economics, 2006, 100 (8) : 223-238.

共引文献41

同被引文献34

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部