2C. Brunner. IEC 61850 Process connection -- a smart solution to connect the primary equipment to the substation automation system[C]. PSCC 2005 (15th Power System Computation Conference), Liege/Belgium, 22. 08. -26. 08. 2005.
4P. Reinhardt, K. P. Brand, I. de Mesmaeker. Maximizing the users benefits -- of IEC 68150 in substation automation systems[J]. Praxis Profiline, 25.08. 2005.