摘要
结合矿山生产扩建的实际需求,研究了应用Surpac软件进行露天矿排土场方案设计的关键问题。利用三维可视化的优势,确定了3处山谷作为排土场选址,并借助于软件中的体积运算功能,以达到设计容积为总要求,完成了3个排土场方案的设计,通过经济、环境、管理等方面综合比较,最终确定最优设计方案。
Key problems of open-pit mine dump ied combined with actual demand of mine production project design by using Surpac soltware were stud- extension. Took advantage of 3-d visualization, 3 valleys were confirmed as dump location, and by means of volume calculation function in software, to reach the design volume as the general request, three dump projects design completed, through compre- hensive comparison on aspects of economy, environment, mangement and so on, the best design project has confirmed finally.
出处
《现代矿业》
CAS
2012年第11期29-31,共3页
Modern Mining