工程建设实施阶段材料价差调整计算方法探讨 被引量:6

Discussion of Engineering Construction Implementation Stage Material Price Adjustment Calculation Method
下载PDF
导出
摘要 铁路工程建设项目投资受国家政策和建筑市场物价变化等因素的影响,为有效控制工程项目投资,工程施工阶段需对材料价差进行动态调整。材料价差调整政策性强、工作量大、要求精细。此文在阐述材料价差调整依据及程序的基础上,对甲供材料和施工企业自购材料价差调整的原则及计算方法进行分析与探讨,提出可采用的计算方法。并结合工程实例进行材料价差调整的计算,验证其计算方法的可行性与可用性。 The railway engineering construction project investment is influenced by the state policy and building market price change and other factors. To effectively control the project investment, it is necessary to dy- namically adjust the material price in the project construction phase. Material price adjustment has the characteristics of strong policy, big workload and fine requirements. Based on expounding the material price adjustment basis and procedure, the principle and calculation method of price adjustment for mate- rials supplied by Party A and construction enterprises are analyzed and discussed. And then the calcula- tion method can be used is put forward. Combined with engineering examples about material price adjustment calculation, the feasibility and availability of the calculation method is verified.
作者 邓建华
出处 《铁路工程造价管理》 2012年第6期7-9,共3页 Railway Engineering Cost Management
关键词 铁路工程 材料价差 调整 计算方法 Railway engineering Material price Adjustment Calculation method
  • 相关文献

参考文献3

二级参考文献5

  • 1铁建管[1998]115号,铁路基本建设工程设计概算编制办法[S].
  • 2铁建设[2006]113号,铁路基本建设工程设计概(预)算编制办法[S].
  • 3铁建设[2006]83号,铁路建设项目物资设备管理办法[S].
  • 4铁建设[2009]46号,关于铁路建设项目实施阶段材料价差调整的指导意见[S].
  • 5彭桂琴.铁路建设甲供物资费用计算内容和方式的探讨[J].铁路工程造价管理,2007,22(5):22-25. 被引量:7

共引文献7

同被引文献14

引证文献6

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部