期刊文献+

基于用例点的软件项目工作量估算 被引量:1

Software Project Effort Estimation Based on Use Case Points
下载PDF
导出
摘要 目前软件估算在软件开发过程中的应用相当普遍而且重要,而以用例模型为基础的用例点估算方法具有容易操作性、实用性、可靠性好等特点。同时对于使用用例估算,存在着不同的方法和途径来估计工作量。文中主要研究软件估算方法中的用例点估算方法,详细描述其在项目工作量估算过程中的流程和方法以及相对应的估算公式。最后通过一个简单的案例展示项目工作量的估算过程,能更好地说明在软件项目工作量估算中用例点估算方法的方便及其可行之处,从而为项目计划和管理提供更好的支持。 Software estimation is quite common and important in the software development process. Use case point estimation method based on the use case model has characteristics of easy maneuverability, practicality, reliability. And there exists different ways and means to estimate the workload with use case estimation. It researches the use case point methods in software estimation methods and describes the processes and methods and the corresponding estimation formulas in the software project effort estimation in detail. Finally,through a simple case demonstrate the project effort estimation process that can better describe the convenience and feasibility with use case point es- timation method in the software project effort estimation,providing the better support for the project planning and management.
作者 朱萍 任永昌
出处 《计算机技术与发展》 2012年第12期71-74,共4页 Computer Technology and Development
基金 国家自然科学基金资助项目(70871067) 辽宁省自然科学基金资助项目(20072207)
关键词 软件估算 用例点 用例模型 UCP方法 软件项目估算 software estimation use case points use case model UCP method software project estimation
  • 相关文献

参考文献13

  • 1任永昌,邢涛,刘大成.基于网络图的软件项目进度计划编制[J].吉林大学学报(信息科学版),2011,29(2):128-134. 被引量:7
  • 2Adolph S, Bramble P, Cockbum A, et al. Patterns for Effective Use Cases[ R]. [ s. 1. ] :Addison-Wesley,2002.
  • 3Cockburn A. Writing Effective Use Cases [ R ]. Boston : Addi- son-Wesley ,2001.
  • 4Ochodek M, Nawrocki J, Kwarciak K. Simplifying effort esti- mation based on use case points [ J]. Information and Software Technology ,2011,53 ( 3 ) :200-213.
  • 5周杨,吴海涛,张栋伟.扩展的用例点估算方法[J].计算机技术与发展,2006,16(12):64-66. 被引量:3
  • 6Albrecht A. Measuring application development productivity [C]//Proceedings of the Joint SHARE/GUIDE/IBM Appli- cation Development Symposium. [ s. 1. ] : [ s. n. ], 1979 : 83 - 92.
  • 7Sym0ns C R. Software Sizing and Estimating: Mk II FPA (Function Point Analysis ) [ R ]. New York, NY, USA:John Wiley & Sons,Inc. ,1991.
  • 8薛丹,杨宸,周健.一种基于区间值的模糊访问控制策略研究[J].计算机技术与发展,2012,22(1):246-249. 被引量:4
  • 9余秋冬,徐辉.用例点估算方法在电信行业中的应用[J].计算机工程,2009,35(24):276-277. 被引量:2
  • 10Schneider G, Winters J. Applying Use Cases: A Practical Guide [ R ]. Boston, MA, USA : Addison-Wesley Longman Pub- lishing Co. ,Inc., 1998.

二级参考文献43

  • 1姚奋超,韩东,罗倩.项目计划管理在软件研发中的应用研究[J].合肥学院学报(自然科学版),2007,17(3):30-33. 被引量:1
  • 2Ribn K. Estimating Object-oriented Software Projects with Use Cases[D]. Oslo, Norway: University of Oslo, 2001.
  • 3Schneider G., Winters J. Applying Use Cases: A Practical Guide[M]. [S. l.]: Addison Wesley Longman Inc., 1998,.
  • 4RogerS.Pressman著.梅宏译.软件工程:实践者的研究方法.北京:机械工业出版社,2005.
  • 5http ://ourworld. compuserve, com/homepages/ softcomp/fpfaq, html.
  • 6http ://www. softwaremetrics, com/articles/Tichenor. htm.
  • 7Jouni Jartti. COSMIC - FFP and Software Cost Estimation. Nokia Research Center,2001.
  • 8Kamer G.Resource Estimation for Objectory Projects[M].Objective Systems SF AB,1993.
  • 9Boehm B W.COCOMOH模型方法[M].北京:机械工业出版社,2005.
  • 10Cockburn A.Writing Effective Use Cases[M].Addison-Wesley,2001.

共引文献16

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史