摘要 提出从面板角点位移、上部结构受力和基桩受弯等方面实施多目标控制设计思想,并通过ANSYS有限元建模分析,详细地研究了码头面板无温差和有温差两种工况下,高桩码头结构在不同施工期气温条件下的变形和受力变化规律。由此确定施工期气温控制为:面板无温差时,施工期气温控制在11.1℃以上,能够确保角点纵向位移满足规范要求;面板有温差时,则施工期气温需高于21.4℃才能满足要求。 This paper proposes the idea of multi-objective control with the displacement of corner points,internal force of upper structures and base piles flexural controlled.With the help of building ANSYS finite element model,researches the laws of transformation and the force changes of wharf structure under different construction temperatures when the panel suffers a temperature difference or not.Through these laws,conclusions can be drawn that only when the construction temperature is higher than 11.1℃,can the displacement of corner points meets the regulatory requirements when there is no temperature difference of the panel.And the value should be higher than 21.4℃when there is a temperature difference.
出处 《水运工程》 北大核心 2012年第11期89-93,共5页 Port & Waterway Engineering
基金 浙江省交通厅科技资助项目(2010W17)
关键词 多目标控制 有限元 施工期气温 multi-objective control finite element construction temperature
  • 相关文献

参考文献7

二级参考文献32

共引文献2681

同被引文献19

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部