摘要
通过对垃圾热解焚烧设备及附属设备的总体布置,提供一种主厂房布置设计方法。并对垃圾电厂的一些特点进行针对性的设计。
Provided a main power block layout design method through the overall layout of the incineration equipment and ancillary equipment, and made design targeted for some of the features of the waste crack and incineration power plant.
出处
《能源与节能》
2012年第12期40-41,50,共3页
Energy and Energy Conservation
关键词
主厂房布置
垃圾电厂
热解焚烧
main power block layout
waste power plant
crack and incineration