摘要
在岩溶准平原区,结合桂林某高层建筑的局部地基处理工程实例,阐述了CFG桩的设计步骤,并进行单桩复合地基静载荷试验数据分析,供岩溶地区高层建筑的地基设计参考。
In karst peneplain area, combined with the local foundation treatment case for certain high-rise building in Guilin, the design process for CFG pile is described and the data from static load test for single pile composite foundation is carried out, on which prouicling the foundation design for high-rise building in karst area for reference.
出处
《路基工程》
2012年第6期157-159,共3页
Subgrade Engineering