摘要
在系统介绍反应位移法原理和计算流程的基础上,结合某电站具体工程进行了不同截面形式地下沟道的反应位移法抗震分析。概述了沟道设计分析过程的参数化实现方法,其中采用五点法实现了沟道中应力到内力的转化。对不同截面形式沟道的内力分布进行了具体的分析研究,绘制了截面的内力包络图,通过内力计算给出了配筋方案。计算得出的规律可以为地下沟道设计与施工提供依据,推动反应位移法在地下结构抗震分析中的应用。
In this paper, the response displacement method and calculation flow were introduced. The seismic anal ysis of response displacement method of underground channel with different crosssections was performed in combi nation with some concrete power station project. Parameterized implementation method of the channel design analy sis process was also introduced,in which the transformation of stress into internal force in channel was achieved by fivenode method. The internal force distribution of different crosssection tunnel was researched and analysed, and envelope diagram of inner force in the crosssection of the tunnel was drawn. Reinforcement arrangement scheme was given through the internal force calculation. The regularity obtained from calculation can provide the basis for the design construction of tunnels, and promote the application of response displacement method in the seismic a nalysis of underground structures.
出处
《世界地震工程》
CSCD
北大核心
2012年第4期28-35,共8页
World Earthquake Engineering
基金
辽宁省教育厅(0102517)
大连市科学技术基金(2010J21DW013)资助项目
关键词
地下沟道
抗震分析
截面形式
反应位移法
underground channel
seismic analysis
section form
response displacement method