摘要 建立了考虑系统风险以及检修费用的输电线路多目标优化检修模型。构造能够计及机组出力波动、负荷波动、线路故障等诸多不确定性因素的系统风险指标,并使用基于半不变量的概率潮流方法进行计算。利用多目标进化算法对输电线路多目标优化检修模型进行求解,RBTS(reliability busbar test system)的算例验证该模型的合理性以及所采用方法的有效性。 This paper establishes a multi-targets optimization inspection mode for transmission lines which considers system risks and inspection expenses, constructs a system risk index which can measure many uncertain factors such as unit output fluctuation, load fluctuation and line faults. It uses probabilistic load flow method based on half invariant for calculation and by multi-targets evolutionary algorithm for solutions to multi-targets optimization inspection model of transmission lines. Ex- ample of reliability busbar test system verifies reasonability of this model and effectiveness of this method.
出处 《广东电力》 2012年第11期62-67,81,共7页 Guangdong Electric Power
关键词 线路检修 风险评估 概率潮流 多目标优化 line repair risk evaluation probabilistic load flow multi-targets optimization
  • 相关文献

参考文献26

  • 1李文沅.电力系统风险评估[M].北京:科学出版社,2006.
  • 2MARWALI M K C, SHAHIDEHPOUR S M. Long-term Transmission and Generation Maintenance Scheduling With Network, Fuel and Emission Constraints[J]. IEEE Transac- tions on Power Systems, 1999, 14(3). 1160-1165.
  • 3丁明,冯永青.发输电设备联合检修安排模型及算法研究[J].中国电机工程学报,2004,24(5):18-23. 被引量:56
  • 4魏少岩,徐飞,闵勇.输电线路检修计划模型[J].电力系统自动化,2006,30(17):41-44. 被引量:39
  • 5FU Y, SHAH1DEHPOUR M, LI Z. Security-Constrained Optimal Coordination of Generation and Transmission Mainte- nance Outage Scheduling [J]. IEEE Transactions on Power Systems, 2007, 22(3). 1302-1313.
  • 6WU L, SHAHIDEHPOUR M, FU Y. Security-Constrained Generation and Transmission Outage Scheduling with Uncer- tainties[J]. IEEE Transactions on Power Systems, 2010, 25 (3) : 1674-1685.
  • 7冯永青,吴文传,孙宏斌,张伯明,何云良,相年德,郭琦,王刚,吕颖.现代能量控制中心的运行风险评估研究初探[J].中国电机工程学报,2005,25(13):73-79. 被引量:67
  • 8MARWALI M K C, SHAHIDEHPOUR S M. Short-term Transmission Line Maintenance Scheduling in a Deregulated System[J]. IEEE Transactions on Power Systems, 2000, 15 (3): 1117-1124.
  • 9J]ANG Y, MCCALLEY J D, Van VOORHIS T. Risk-based Resource Optimization for Transmission System Maintenance [J]. IEEE Transactions on Power Systems, 2006, 21 (3): 1191-1200.
  • 10NI M, MCCALLEY J D, VITTAL V, et al. Software Im- plementation of Online Risk-based Security Assessment [J]. IEEE Transactions on Power Systems, 2003, 18 (3) . 1165- 1172.