摘要
以盖孜水电站施工控制网为例,对建立GPS施工控制网的作业流程进行了介绍,对其精度进行了统计分析,对工作中的经验进行了总结,并指出了GPS控制网测量过程中应注意事项,为今后同类水利工程测量提供了借鉴。
Taking the construction controlling network at Ghez Hydro-power Station as the example, the paper introduces the working procedure for the establishment of GPS construction controlling network, undertakes the statistic analysis of its accuracy, and sums up the experience in the construction, and points out some precautions in the measurement process of GPS controlling network, so as to provide some reference for similar hydraulic measurement in future.
出处
《山西建筑》
2013年第1期179-180,共2页
Shanxi Architecture
关键词
GPS施工控制网
作业流程
精度
GPS construction controlling network, working procedure, accuracy