摘要
分析了设计阶段中各子项目阶段的主要任务,针对设计阶段现存的问题,探讨了方案设计阶段投资控制的具体措施和优化设计的必要性及积极作用,指出应在现有法律法规及相关管理制度基础上,从设计阶段就落实投资控制。
The paper analyzes the main tasks at all phases at the design phase, explores the factual measures, the necessity for the optimal de- sign and its positive role at the scheme design phase, and points out the investment control should be implemented at the design phase based on the current laws and regulation, as well as relative management system.
出处
《山西建筑》
2013年第1期210-212,共3页
Shanxi Architecture
关键词
设计阶段
投资控制
施工图审核
优化设计
design phase, investment control, auditing of construction graph, optimal design