摘要
介绍了选煤厂的传统建设模式,针对传统模式的局限性,提出了EPC总承包模式和BOT总承包模式的应用,并对两种模式各自的优缺点作了分析,同时指出建设模式的发展趋势,为工程项目建设模式的选择指明了方向。
The paper introduces the traditional construction models for the coal preparation plants, points out the application of EPC general con- tracting model and BOT general contracting model based on the limitation for the traditional models, analyzes the advantages and disadvantages of the two models respectively, and points out the development tendency for the construction model, so as to have the direction for the selection for the construction models for the engineering programs.
出处
《山西建筑》
2013年第1期233-234,共2页
Shanxi Architecture