摘要
为了提升工程进度管理水平,实现工程进度管理的科学化,可控化,系统化,对实际工程进度进行跟踪检查,并与计划进行对比和有效的调整,将P3管理软件运用到实际工程管理中,从而保证了工程的顺利完工。
In order to improve the project progress management level, make the project progress management scientific, controllable change and systematic, carry on the track inspection of the practical project progress, compare with the plan and do some effective adjustment, P3 manage- ment software is applied to practical engineering management, and make sure the project successfully completed.
出处
《山西建筑》
2013年第1期251-253,共3页
Shanxi Architecture
关键词
施工管理
工程进度管理
P3软件
construction management, progress of the project management, P3 software