摘要
施工前一定要先建立BIM模型,进行碰撞检查;施工前一定要对施工班组进行三维虚拟交底;施工中使用的材料一定是利用碰撞检查调整后的模型中进行工程量测算的数据结果。
BIM model must be established and doing collision checking before construction; the 3D dummy construction intention telling must be done for the construction team before construction; The material used in the construction must be doing engineering quantity calculation by the model after collision checking.