摘要
就地铁与公路合建桥区段,接触网系统如何结合土建连续低净空条件,确定悬挂安装方式及可采用的预埋方案、悬挂和绝缘措施、设备安装等方面的特殊设计方案,并提出了其他需注意的问题,可为该区段架空接触网设计方案选择提供参考。
The subway and highway combined bridge section,OCS how to combine civil continuous low headroom conditions,determine the suspension installation mode and can be used in embedded solution,suspension and insulation measures,equipment installation and other aspects of the special design,and puts forward some problems needing attention in the other,for the section OCS design scheme selection provide reference.
出处
《电气化铁道》
2012年第6期16-18,共3页
Electric Railway