分析了重庆单轨交通二号线和三号线联络线信号系统接口方案,介绍了接口电路、逻辑处理及相关按钮设置。对于单轨渡线上无法安装计轴设备的特殊情况,提出了针对性的处理方法,并介绍了车辆转线运行的操作流程。
This paper analyzes the junctor signaling system interface project of Chongqing Monorail Traffic Line two and Line three,and gives the details of the interface circuits,logic processing and button setting.For the special case of the axle counting equipment cannot be installed on the monorail crossing line,this paper proposes a targeted approach.and describes the operational processes of vehicle changing lines running.
出处
《电气化铁道》
2012年第6期49-51,共3页
Electric Railway
关键词
重庆单轨
信号系统
列车位置检测
monorail of chongqing
signal system