摘要
为得到小直径开口钢管桩的沉桩阻力计算公式,对开口钢管桩的土塞效应、挤土效应和软化效应进行了分析,结合静力触探原理,提出了沉桩阻力计算公式,将沉桩过程分为土塞闭合前后两个阶段,分别计算了桩侧阻力和桩端阻力的拟合系数,得到了小直径开口钢管桩的两阶段沉桩阻力计算公式。与工程实际测试数据符合较好。结果为黄河冲积平原粉土土质的坑式钢管静压桩提供了工程参考。
To get the pile-sinking resistance calculation tormula ot smart aperture opening steer pipe pile,the plugging effect,squeezing effect and strain softening effect of open ended steel pipe pile are analyzed. The pile-sinking resistance formula is proposed combined with cone penetration test, the pile-sinking process is divided into two stages:before and after inner soil blocked, and the fitting coefficients of pile side resistance and pile tip resistance are calculated respectively, and the two stages pile-sinking resistance calculation formula of small aperture opening steel pipe pile is obtained. The results fit the test dates in engineering wen. The research results can provide reference to pit-jacked steel pipe pile in Huanghe alluvial plain silt soil.
出处
《四川建筑科学研究》
2012年第6期122-124,134,共4页
Sichuan Building Science
关键词
钢管桩
土塞
沉桩阻力
拟合
steel pipe pile
soil plugging
pile-sinking resistance
fitting