期刊文献+

塔内件安装精细化质量管理措施的编制 被引量:3

Tower Internals Installation Fine Quality Management Measures of Establishment
下载PDF
导出
摘要 文章涉及为宁东120万t/a煤基多联产项目的 15台关键塔器塔内件的安装工作,为保证塔内件安装质量,实现塔内件的安装控制标准和指标,特编制塔内件安装精细化质量管理措施,以规范和指导业主、施工单位、监理的质量控制活动。塔内件安装精细化质量管理工作的开展,明确了塔内件安装监督检验验收工作中的具体办法,使塔内件安装监督检验工作验收落到了实处。 The paper involves 15 table key columns of tower internals installation work of 1.2 million tons per year for Coal-based Chemistry Project of Guodian Ningxia Younglight Ningdong Coal-based Chemistry Co., Ltd., to ensure the tower internals installation quality, realized tower internals installation control standards and indicators, especially preparation of tower internals installation fine quality management measures ,to regulate and guide the owner, the construction unit, the quality control activities of construction supervision .Tower internals installation fine quality management work's development, has been clear about the tower internals installation supervision and inspection work of the specific measures, makes the tower internals installation supervision and inspection work fell on feet.
出处 《广东化工》 CAS 2012年第17期85-86,98,共3页 Guangdong Chemical Industry
关键词 塔器塔内件 安装质量控制 精细化质量管理措施 tower internals: tower internals installation quality: fine quality management measures
  • 相关文献

参考文献2

  • 1HGJ211-85.化工塔类设备施工及验收规范》.
  • 2JB/T1205.2001.《塔盘技术条件》.

同被引文献13

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部