拟建的原油储库储油罐组由10万m3储油罐组成,库区绝大部分场地为填海造地所形成,因此研究确定采用强夯法处理该基础,以减少不均匀沉降。文章从库区工程地质条件与力学性质、强夯技术参数的确定与施工方案、强夯施工过程的质量控制等,论述了新建储罐回填土地基强夯处理的施工程序与质量控制方法。
The planned Rizhao Commercial Oil Depot consists of 100 000 m 3 tanks.Because the most site area of the depot is formed by filling earth into sea,it is determined to adopt heavy tamping foundation treatment method to decrease non-uniform foundation settlement.The construction procedure and quality control methods of heavy tamping foundation treatment for the planned project are discussed in aspects of the engineering geological conditions and soil mechanical properties of the deport area,technical parameter determination of heavy tamping,construction procedure and quality control.