摘要
结合规划中的京沪高速铁路南京长江沉管隧道工程的具体条件,对影响隧道建设规模、工期与造价的竖井位置进行了探讨,同时对深基槽开挖情况下竖井侧的护岸形式进行了论证比较。
Combining with the Changjiang immersed tunnel on Beijing - Shanghai High - speed Railway, this paper discusses the shaft location which affects the tunnel construction scale, construction period and cost. Meanwhile it comparatirely demonstrates the types of bank revetment beside shaft under the condition of deep trench.
关键词
高速铁路沉管隧道
竖井位置
护岸
High -speed Railway
Immersed Tunnel
Shaft Location
Bank Revetment