北京地铁天安门西站设计施工方案比选及优化 被引量:9

Selection and Optimization of Design and Construction Scheme for Tian'anmen West Station of Beijing Metro
下载PDF
导出
摘要 北京地铁天安门西站历时7年(1992~1999)建成,其间对车站主体进行了多次方案研讨,经技术经济综合比较,把车站主体结构施工方法由“CRD”工法改为浅埋暗挖“洞、桩、墙”逆做法,文章对地铁车站初次采用“洞、桩、墙”法施工的细部方案设计作了较为系统的阐述。 It took seven years to finish the Tian'anmen West Station of Beijing Metro from 1992 to 1999 during which the scheme for the station 's main structure has been studied and discussed for many times, and finally the construction method was changed from 'CRD' to shallow depth & bored 'bottom up' method consisting of 'tunneling, piling & side wall 'after technical and economical comparison. The paper gives a systematic description of the detailed scheme design of this method that was firstly adopted in the metro station.
作者 肖广智
出处 《世界隧道》 2000年第1期23-27,共5页
关键词 地铁车站 施工方案 比选 优化 Metro Station Construction Scheme selection Optimization
  • 相关文献

同被引文献76

引证文献9

二级引证文献49

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部