期刊文献+

铁路客运站应对高峰客流的对策研究 被引量:1

Countermeasures of Railway Passenger Stations in Response to Peak Passenger Flow
下载PDF
导出
摘要 通过分析铁路客运站应对客流高峰存在的问题,认为应从人流引导和客运站规划方面进行解决。在人流引导方面,客运站应该做好提前客流预测、加强员工培训、协调其他运输部门以及加大先进设施的运用;在客运站规划方面,通过分析国外先进客运站实例,总结相应经验,为铁路客运站应对高峰客流提供参考。 Analyzing the problems of railway passenger station during peak time for passenger transport,this paper points out the solutions,including passenger guiding and station design.As to passenger guiding,the station should forecast the volume of passengers in advance,strengthen stuff training,coordinate other transport departments and apply some advanced equipments.About the station design,through the analysis of foreign stations,this paper concludes some experiences,so as to provide reference for dealing with peak passenger flow.
作者 王道奇 张霄
出处 《交通标准化》 2012年第23期65-67,共3页 Communications Standardization
关键词 铁路客运站 高峰客流 人流引导 客运站规划 railway passenger station peak passenger flow passenger guiding railway station design
  • 相关文献

参考文献3

二级参考文献2

  • 1郑健.我国铁路客站规划与建设[J].铁道经济研究,2007(4):20-30. 被引量:29
  • 2铁道第三勘察设计院集团有限公司.北京南站改扩建工程深化初步设计[R].天津:铁道第三勘察设计院集团有限公司,2006.

共引文献21

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部