摘要
本文根据笔者的亲身经历 ,对秦岭特长隧道从初测子阶段到施工阶段全过程的水文地质工作进行了详细的归纳、总结 。
Based on the author's personal experiences, a detailed description of hydrogeological work on Qinling extra long tunnel from its sub initial survey stage to the construction stage has been presented here. Meanwhile, the importance of synthetic hydrogeological work in the tunnel project has been emphasized also in the article.
出处
《铁道工程学报》
EI
2000年第1期82-86,共5页
Journal of Railway Engineering Society
关键词
综合水文地质工作
涌水量
铁路隧道
Qinling extra long tunnel
synthetic hydrogeological work
calculation of tunnel discharge