冷却柱技术引进与自主开发实践 被引量:2

Practice of Introduction and Independent Development of the Cooling Walls Technology
下载PDF
导出
摘要 2006年8月酒钢1#高炉炉腹6、7段冷却壁有4块冷却壁破损。当时引进使用铜冷却柱技术替代恢复已损坏冷却壁冷却功能效果良好。2007年以来6#高炉炉身冷却壁破损加剧,又引用同一厂家铜冷却柱技术。实践证明该技术是一种成熟可靠而实用的高炉护炉技术。但是随着4×450 m3高炉冷却壁频繁破损,依靠大量外购冷却柱来满足护炉需要的成本非常巨大,而且对企业的局限性很大。我们通过自主研制开发,生产出来可替代外购产品的铜钢一体冷却柱和钢质冷却柱,既节省了外购资金又完全满足护炉需要。 4 pieces of cooling wall in the 6 and 7 section of the 1 # B F in Jiugang on August ,2006 , which was recovered u sing introduced copper cooling columns and worked well. The same source of material was used to recover rest of the cooling wall of the No. 1 BF body. Practice has proven that the technology is reliable and practical. But with the frequent damage of the cooling columns in the 4 x 450 m3 BF, the furnace repair cost is increasing enormously. By independent develop ment, we have produced coppersteel integrated columns and steel columns to substitute for the imported products with re duced cost and meet protection requirement of the furnace.
出处 《甘肃冶金》 2012年第6期1-6,共6页 Gansu Metallurgy
关键词 冷却柱技术 引用 自主开发 实践 cooling column technology introduction cooling column technology practice
  • 相关文献

同被引文献33

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部