期刊文献+

港珠澳大桥沉管隧道管节预制厂选址研究 被引量:4

Studies on the Site Selection of a Segment Prefabrication Factory for the Immersed Tunnel of the Hong Kong-Zhuhai-Macao Bridge Project
下载PDF
导出
摘要 文章主要介绍了港珠澳大桥工程概况和沉管隧道管节预制厂的选址过程。港珠澳大桥沉管隧道管节预制厂可供选择的场地有广州南沙龙穴岛及伶仃洋桂山岛。根据沉管隧道预制厂的概况、生产流程,及其对港珠澳大桥项目的重要性,明确了选址需要考虑的因素;通过对比和分析南沙龙穴岛与伶仃洋桂山岛的地理位置及交通情况,以及地质与岩土工程方面存在的问题,本着工程安全为最重要因素的思路,选择了伶仃洋桂山岛作为港珠澳大桥沉管隧道管节预制厂厂址。 This paper introduces the selection process for the site mersed tunnel of the Hong Kong-Zhuhai-Macao Brid tion factory were Longxue Island and Guishan Island of a segment prefat)rication factory for the im- ge Project (HZM This paper expli Bridge). The proposed sites for the prefabrica- cares the factors used in site selection, includ- ing a survey of the prefabrication factory, work flow, and the importance to the HZM Bridge. Based on a comparison of their geographic positions, transportation conditions, and existing problems regarding geology and geotechnical engi- neering, Guishan Island was chosen as the site of the segment i)refabrication factory.
出处 《现代隧道技术》 EI 北大核心 2012年第6期122-127,共6页 Modern Tunnelling Technology
基金 国家自然科学基金项目(编号:51108190) 亚热带建筑科学国家重点实验室自主研究课题(编号:2012ZC27)
关键词 港珠澳大桥 沉管隧道 管节预制厂 选址 HZM Bridge Immersed tunnel Prefabrication factory of tunnel segment Site selection
  • 相关文献

参考文献11

  • 1N. Hussain Carlos Wong, Matt Carter, Samuel Kwan, Tak-Wah Mak. Hong Kong-Zhuhai- Macao Link[J]. Procedia Engineering, 2011, 14:1485-1492.
  • 2Chris Marshall. The Oresund Tunnel--Making a Success of Design and Build[J]. Tunneling and Underground Space Technology. 1999, 14 (3): 355-365.
  • 3中铁西南科学研究院信息研究室译.厄勒海峡沉管隧道会议论文集[C].2003.
  • 4Niels J Gimsing Claus Iversen, Development and Design of Casting Yard[C].//The Oresund Technical Publications, 2001.
  • 5Fernando Hue Guillermo Serrano, Juan Antonio Bolan. Oresund Bridge - Temperature and Cracking Control of the Deck Slab Concrete at Early Ages [J]. Automation in Construction, 2000, 9 (5-6): 437-445.
  • 6Jan Saveur Walter Grantz. Structural Design of Immersed Tunnels [J]. Tunneling and Underground Space Technology, 1997, 12 (2): 93- 109.
  • 7Hiroshi Kishimoto, Rokkasho: Japanese Site for ITER [J], Fusion Engineering and Design. 2003, 69 (1-4): 553-561.
  • 8M. Medrano C. Alejaldre, J. Doncel. ITER Site Selection Studies in Spain [J]. Fusion Engineering and Design. 2003, 69 (1-4): 537-544.
  • 9刘勇健,李彰明,伍四明,吴加武.南沙地区软土物理力学性质指标与微结构参数的统计分析[J].广东工业大学学报,2010,27(2):21-26. 被引量:21
  • 10Ahmet Gokce Fumio Koyama, Masahiko Tsuchiya. The Challenges Involved in Concrete Works of Marmaray hnmersed Tunnel with Service Life Beyond 100 Years [J]. Tunneling and Underground Space Technology,2009, 24 (5): 592-601.

二级参考文献9