期刊文献+

西安市轨道交通Ⅱ号线B标岩土工程特征

The Geotechnical Engineering Characteristics of Lot B of the Urban Mass Transit Line 2
下载PDF
导出
摘要 地铁设计需要多种岩土参数,这些参数可通过室内试验及现场原位测试获得。文章以西安市城市快速轨道交通Ⅱ号线B标岩土工程勘察为例,不仅总结了B标岩土的一些总体工程特征及有关参数的统计数据,为结构设计、降水设计提供了必要的依据;而且在方法上也可为西安地铁岩土工程勘察提供借鉴。同时,这些岩土工程特征及岩土参数,还可为西安城区同类或相似场地岩土工程设计提供参考,也可为丰富西安市城市环境地质内容提供补充资料。 Metro engineering requires a great variety of geotechnical parameters, which can be obtained eilher from laboratory tests or in-situ tests. Using the geotechnical investigation of lot B of line 2 of the Xi'an Rapid Urban Mass Transit as an example, this article not only summarizes the general characteristics of geotechnical engineering and rel-evant statistics about geoteehnieal parameters of lot B, whieh serves as essential evidence for the structural design and the dewatering design, but also provides a reference for the Xi'an metro engineering exploration methodologically.Meanwhile, these geotechnical engineering characteristics and parameters can also be used as a reference for the geoteehnical design of similar sites in Xi'an.
作者 石中平
出处 《现代隧道技术》 EI 北大核心 2012年第6期133-138,共6页 Modern Tunnelling Technology
关键词 轨道交通 Ⅱ号线 岩土工程特征 Rail transit Line 2 Characteristics of Geotechnical engineering
  • 相关文献

参考文献7

  • 1中交第一公路勘察设计研究院有限公司.西安市城市快速轨道交通2号线一期工程岩土工程勘察报告[R].西安,2008.
  • 2陕西省地质矿产勘查开发局,陕西省计划委员会.西安地区环境地质图集[M].西安:西安地图出版社,1999.
  • 3陕西省地质矿产勘查开发局.西安市城市地质图集[M].西安:西安地图出版社,1989.
  • 4地质矿产部水文地质工程地质技术方法研究队.水文地质手册[M].北京:地质出版社,1978.389.
  • 5供水水文地质编写组.供水水文地质手册[M]北京:地质出版社,1978.
  • 6中华人民共和国行业标准.TB10049-2004铁路工程水文地质勘察规程[s].北京:中国铁道出版社,2004.
  • 7中华人民共和国行业标准.J339-2004铁路工程水文地质勘察规程[s].北京:中国铁道出版社,2004.

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部