摘要
文章以长沙市湘江大道浏阳河隧道暗挖段施工为例,介绍了该工程所采用的长短管棚和小导管相结合的超前支护、玻璃纤维锚杆超前加固、地面垂直注浆和全断面超前帷幕预注浆等复杂地质条件下暗挖段超前综合加固支护施工技术。工程实践证明,此项技术有效地保障了暗挖段的施工质量和安全。
Using the bored construction of the Liuyang river tunnel in Changsha as an example, this paper introduces integrative advance support technology under complex geological conditions, such as the combination of long pipe-roofing, short pipe-roofing, fiberglass anchor bolts, ground vertical grouting, and full-face curtain grouting, effec- tively guaranteeing construction quality and safety.
出处
《现代隧道技术》
EI
北大核心
2012年第6期158-161,167,共5页
Modern Tunnelling Technology
基金
河南省教育厅自然科学研究计划项目(2011B560018)
关键词
地铁隧道
超前支护
注浆
管棚法
Mined tunnel
Advance support
Grouting
Pipe-roof