期刊文献+

地震应急能力成熟度模型的体系与结构研究 被引量:7

Study on system and structure for earthquake emergency capability maturity model
下载PDF
导出
摘要 地震应急工作是防震减灾工作的重要组成部分,它具有时效性强、协调性强、专业性强、社会要求高等特点,是一项技术含量很高的工作,因此地震应急能力的成熟度评估具有重要意义并富有挑战性。本文在地震应急能力中应用成熟度模型,在研究借鉴多种成熟度模型的基础上,提出地震应急能力成熟度模型的概念和构成要素,明确各要素之间的相互关系,建立了以成熟度单元为核心的两层次结构体系模型,提出了模型的基本评价方法。 Earthquake emergency is an important component of protection against earthquake and disaster reduction. Because it has its own inherent characters, like timeliness, coordination, professionalism and social demand, and is a high-teeh work, assessment of earthquake emergency capability maturity becomes more significant and challeng- ing. Based on studying and referring many models, this paper offers the concept and basic components of Earth- quake Emergency Capability Maturity Model (EECM2) , establishes a two-layer structure system model and basic and makes the relationship among them clear, and also evaluation method with maturity unit as its core
出处 《地震工程与工程振动》 CSCD 北大核心 2012年第6期182-186,共5页 Earthquake Engineering and Engineering Dynamics
基金 中央级公益性研究所基本科研业务费专项面上项目(2008B07) 国家自然科学基金项目(51278474) 地震行业专项(20118003)
关键词 地震应急能力 成熟度模型 成熟度单元 earthquake emergency capability maturity model maturity unit
  • 相关文献

参考文献7

  • 1中国地震局震灾应急救援司编.地震应急[M].北京:地震出版社,2004.
  • 2侯建盛,李民.地震应急管理进展[J].国际地震动态,2008,29(1):14-20. 被引量:24
  • 3Pennypacker J S, Grant K P. Project management maturity : An industry benchmark [ J ]. Project Management Journal. 2003, 34 ( 1 ) : 4 - 11.
  • 4Kwakl Y H,Ibbs C W. Project management process maturity (PM)2 Model[J]. Journal of Management in Enginecring,2002, 18(3) : 150 -155.
  • 5Kerzner, Harold. Strategic Planning For A Project Office [ J ]. Project Management Journal,2003, 34 ( 2 ) : 13 - 25.
  • 6Project Management Institute. OPM3-Organizational Project Management Maturity Model[ M ]. PMI. 2003.
  • 7李忠富,王丹,五百井俊宏.建设项目管理成熟度模型CPM3的体系与结构[J].哈尔滨工业大学学报,2006,38(11):1989-1992. 被引量:14

二级参考文献11

  • 1徐德诗,黄建发.我国地震应急与救援发展的思考[J].国际地震动态,2006,27(10):1-8. 被引量:18
  • 2五百井俊宏など.プロジェクトマネジメント成熟度モデル(PMMM)における5W1H[J].日本プロジェクトマネジメント学会誌,2002,4(4):27—31.
  • 3谷口功.最新CMMの基本と仕粗み[M].Chiba:秀和システム,2003.
  • 4PENNYPACKER J S, GRANT K P. Project management maturity : An industry benchmark [ J ]. Project Management Journal, 2003 ( 1 ) : 4 - 11.
  • 5KWAKI Y H, IBBS C W. Project management process maturity (PM) 2 model [ J ]. Journal of Management in Engineering, 2002,18 (3) : 150 - 155.
  • 6KERZNER H. Strategic planning for a project management[J]. Project Management, 2003(2): 13 -25.
  • 7Project Management Institute. OPM3-Organizational Project Management Maturity Model [ M ]. [ s. l. ] : PMI,2003.
  • 8吴涛,丛培经.建彀项日管理规范实施手册[M].北京:中国建筑工业出版社,2002.
  • 9云南举行“云震07”地震应急救援联合演习.http://www.yn.xinhuanet.com/gov/2007-04/19/content_9835656.htm.
  • 10五百井俊宏,李忠富.项目管理成熟度模型(PMMM)研究与应用[J].建筑管理现代化,2004,18(2):5-8. 被引量:29

共引文献36

同被引文献65

引证文献7

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部