期刊文献+

电力机车状态修方案的研究 被引量:3

Schematic Study of Maintenance Work Based on State of Electric Locomotive
下载PDF
导出
摘要 针对铁路机车提速、重载引起的牵引布局调整,机车检修体制的变化,以及新型大功率机车以检测代替日常检修所存在的问题,提出机车整备作业,兼顾小辅修作业,利用检测设备进行状态修的具体实施方案,并对该方案实施可行性及经济效益进行分析。 In allusion to the issues caused by locomotive speed-up and heavy haulage, including the adjustment of the traction pattern, the change of the locomotive maintenance system, and the problems in new high-power locomotive detection instead of the daily maintenance, this article puts forward the specific implementation plan for locomotive servicing work in which the small auxiliary maintenance work was given consideration and the detection device was utilized to do the maintenance work based on locomotive's state. In addition, the analysis on the feasibility and the economic benefit about this implementation plan are carried out in this article.
作者 曹津晖
出处 《铁道标准设计》 北大核心 2013年第1期127-129,共3页 Railway Standard Design
关键词 电力机车 机车状态 检修模式 整备作业 electric locomotive state of locomotive repair and maintenance mode servicing work
  • 相关文献

参考文献2

二级参考文献3

  • 1TB10004-98.铁路机务设备设计规范[S].[S].,..
  • 2TB10022-2000,铁路电力机车机务设备设计规范[S].
  • 3铁机[1993]164号,铁路机车运用规程[S].

共引文献1

同被引文献12

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部